Portugal

Euroscut Algarve Toll Road

Shadow toll road (in Portuguese, SCUT: Sem Cobrança ao Utilizador): drivers do not pay the tolls for using the road but the granting authority does.

  • 130 Km of shadow toll road in southern Portugal.

  • 30-year concession contract from 2000 to 2030.

  • 282.2 million euro investment.

Euroscut Norte-Litoral Toll Road

Shadow toll road (in Portuguese, SCUT: Sem Cobrança ao Utilizador) operated so that the drivers do not pay to use it but the granting authority does.

  • 119 Km of shadow toll road between Oporto and the Northern border with Spain: 72 Km of refurbishment and 47 km is new build.

  • 30-year concession contract from 2001 to 2031.

  • 366.7 million euro investment.

Scut Açores Toll Road

High capacity road system which will significantly improve the road network in the Central and Eastern areas of San Miguel.

  • 93.7 Km of shadow toll road on the Island of San Miguel: 45.9 Km is new build and 27.5 Km of refurbishment and operation work.

  • 20.3 Km in operation.

  • 30-year concession contract from 2006 to 2036.