Greece

Ionian Roads Toll Road

Two separate sections of toll road: Pathe section: 161.7 Km already in operation  from Athens to Thessaloniki and the Ionian Road section: 159 Km from Patras to Ioanina, in the North.

  • 378.7 Km divided into two separate sections: 159 Km is new build, 161.7 Km has already been built and is in operation and 58 Km is being built by the government.

  • 30-year concession contract from 2007 to 2037.

  • 1.1 billion euro investment.

Central Greece Toll Roads

The toll road is divided into two sections. Central Greece, which is 174 km, will be entirely built by the consortium. The second one, which is adjacent to the first, is 57 km long and will be built by the government and subsequently transferred to the concession company.

  • 231 Km running from the south to the north east through the centre of the country: 174 km is new build and 57 Km is being built by the government.

  • 30-year concession contract from 2008 to 2038.

  • 1.45 billion euro investment.